Re: Special Conditions for Lake/Pond Drawdowns


[ Follow Ups ] [ Post Followup ] [ Conservation Connections ] [ FAQ ]

Posted by Anon (170.63.44.133) on October 16, 2002 at 11:07:40:

In Reply to: Special Conditions for Lake/Pond Drawdowns posted by Michele Girard on October 16, 2002 at 10:54:19:

What is the purpose for the drawdown?
You could refer to the DEP Interim Technical Guidance 90-TG 1: Review of Lake and Pond Drawdown Projects for Aquatic Plant Control under 10.53(4)
Below is the link:
http://www.state.ma.us/dep/brp/ww/files/drawdown.htm


Follow Ups:



Post a Followup

Name:
E-Mail:

Subject:

Comments:

Optional Link URL:
Link Title:
Optional Image URL:


[ Follow Ups ] [ Post Followup ] [ Conservation Connections ] [ FAQ ]